Julkuvaara

Otsotuuli Oy suunnittelee tuulipuiston rakentamista Lieksan kunnan alueella sijaitsevalle Julkuvaaran alueelle. Hankealue sijoittuu noin 20 km Lieksan kuntakeskuksesta etelään

Project phase: 
Development
Nominal power (estimated): 
21.0 MW
Number of generating units: 
7

According to the plan, the project will include 7 wind turbines. The turbine power is approximately 3 MW.  The maximum hub height of the wind turbines would be up to 120 meters and the rotor diameter up to 120 meters.

The wind farm will be connected to the Fingrid distribution and transmission system will be made inside the project area so there is no need to build new overhead line.